🖋️
V:Server 4 Manual
  • V:Server 4 Manual
  • Welcome to Syncronorm - V:Server 4
    • About us
    • Safety Instruction
    • Overview
    • Technical Data
    • Connectors Pin Out
    • Connecting V:Server4
    • Maintenance and Cleaning
    • Guarantee
  • Operation
    • LED Signals
    • Tile: Show Player
    • Tile: Schedule
    • Tile: Next Show
    • Tile: Audio Volume
    • Tile: Timecode Synchronization
    • Tile: Daylight Control
    • Tile: Input Output
    • Tile: Digital and Analog Ports
    • Tile: Project Information
    • Tile: System Date and Time
    • Tile: Network Config
      • Config vServer 4.0 (Depence 2)
      • Config vServer 4.5 (Depence 3)
        • Connection Example
    • Tile: System and Project overview
Powered by GitBook
On this page

Was this helpful?

  1. Operation

LED Signals

The current state of the V:Server4 can be determined via the indicated color of the “Depence” logo LED. The individual colors have the following meanings:

LED Color

Meaning

blue

A show project was loaded without errors and is ready for operation

green

A show is currently playing

yellow

A show project is currently being loaded

red

An error has occurred (see Appendix: Troubleshooting)

violet

A show update is being carried out

cyan

A show update is being prepared

PreviousOperationNextTile: Show Player

Last updated 3 years ago

Was this helpful?